奶头挺立呻吟高潮av全片,成人试看120秒体验区,性欧美极品v,A片高潮抽搐揉捏奶头视频

試題

大學英語六級閱讀理解摸底訓練

時間:2025-06-01 13:45:24 試題 我要投稿
  • 相關推薦

大學英語六級閱讀理解摸底訓練

  The way to learn a language is to practice speaking it as often as possible.以下是小編為大家搜索整理的大學英語六級閱讀理解摸底訓練,希望能給大家帶來幫助!更多精彩內容請及時關注我們應屆畢業生考試網!

大學英語六級閱讀理解摸底訓練

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標準件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  參考答案: 1. A 2. C 3. B 4. D 5. A

【大學英語六級閱讀理解摸底訓練】相關文章:

大學英語六級閱讀理解特別訓練07-01

大學英語六級閱讀理解專題訓練05-30

大學英語六級閱讀理解專項訓練07-20

大學專四TEM閱讀理解摸底練習07-23

最新大學英語六級試題訓練閱讀理解05-27

大學英語六級閱讀理解加分訓練201708-26

大學英語六級閱讀理解提分訓練10-16

大學英語六級閱讀理解特別訓練題型07-19

大學英語六級閱讀理解特別訓練201709-17

主站蜘蛛池模板: 韶关市| 浮梁县| 板桥市| 合江县| 建始县| 宁德市| 丰镇市| 图片| 噶尔县| 伊金霍洛旗| 青海省| 河津市| 曲松县| 荆门市| 江都市| 博白县| 武安市| 德钦县| 乡宁县| 夏津县| 敦煌市| 鄂伦春自治旗| 古交市| 渑池县| 民勤县| 浮山县| 法库县| 青铜峡市| 绥芬河市| 资溪县| 万年县| 苍山县| 尉氏县| 浠水县| 晋城| 中阳县| 金昌市| 宁强县| 民丰县| 岳阳县| 休宁县|