奶头挺立呻吟高潮av全片,成人试看120秒体验区,性欧美极品v,A片高潮抽搐揉捏奶头视频

試題

六級閱讀理解預測題及答案

時間:2024-09-22 03:05:48 試題 我要投稿

2017六級閱讀理解預測題及答案

  2017年大學英語四級考試即將到來,備考工作正在如火如荼地進行中,為了幫助大家更好的復習功課,以下是小編為大家搜索整理的2017六級閱讀理解預測題及答案,希望能給大家帶來幫助!更多精彩內容請及時關注我們應屆畢業生考試網!

2017六級閱讀理解預測題及答案

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標準件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  2. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  4. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  5. What lifts the concrete panels onto the building?

  A. Cranes. B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  參考答案: 1. A 2. C 3. B 4. D 5. A

【六級閱讀理解預測題及答案】相關文章:

英語六級閱讀理解預測題及答案08-16

職稱英語閱讀理解預測題(附答案)08-11

2016下半年英語六級閱讀理解預測題08-21

2017年學位英語閱讀理解預測題09-27

托福閱讀真題預測及答案解析10-12

2016年12月大學英語六級閱讀理解預測題05-22

2017年大學英語六級閱讀預測題帶答案08-02

考研英語閱讀理解專項真題答案09-28

英語六級詞匯選項預測押題及答案02-02

英語考試閱讀理解考前輔導題及答案06-26

主站蜘蛛池模板: 新晃| 秦皇岛市| 奇台县| 澜沧| 庆安县| 辉南县| 九龙坡区| 淳安县| 徐州市| 临朐县| 钟山县| 宽城| 根河市| 通化市| 灵璧县| 兖州市| 阳高县| 开封县| 永和县| 乌拉特中旗| 江永县| 海南省| 巴林右旗| 克什克腾旗| 兴义市| 荆州市| 商河县| 扬中市| 乌兰察布市| 抚顺市| 临泉县| 仲巴县| 伊金霍洛旗| 黔西| 华坪县| 莎车县| 云南省| 保靖县| 清新县| 密云县| 邳州市|