奶头挺立呻吟高潮av全片,成人试看120秒体验区,性欧美极品v,A片高潮抽搐揉捏奶头视频

英文會(huì)議紀(jì)要

時(shí)間:2023-02-21 12:12:36 例會(huì)制度 我要投稿

英文會(huì)議紀(jì)要范文

Meeting record

英文會(huì)議紀(jì)要范文

Project name: make the report

Date of meeting: May 13, 2012

Minutes prepared by: Zhang Huizhuan

Charge time to: 20 minutes

1. Purpose of the meeting

Finish the topic of business results and give the report

2. Attendance at meeting

Zhang Huizhuan Li Gaojie Qiu Min Li Yajun Zhen Peipei Chen Na Liu Dan Niu Pu

3. Meeting agenda

(1) Definite the responsibility of every member

(2) Talk about how to write the report

(3) Make the report to the whole one

4. Meeting notes, decision, issues

Niu Pu is in charge for the introduction;

Chen Na and Li Yajun is in charge for ananlysis the chart for sales and market;

The others of the group are responsible for the talk about how to describe the business results Zhang Huizhuan makes the conclusion; give the chart for the topic and the whole order of the report.

Group: dream sky

Meeting record

Project name: talk about the PowerPoint

Date of meeting: May 18, 2012

Minutes prepared by: Zhang Huizhuan

Charge time to: 20 minutes

1. Purpose of the meeting

Make the PowerPoint for the topic of business results, and definite the role of the whole presentation

2. Attendance at meeting

Zhang Huizhuan Li Gaojie Qiu Min Li Yajun Zhen Peipei Chen Na Liu Dan Niu Pu

3. Meeting agenda

(1) Talk about the member’s order of giving the presentation

(2) Definite the part of every member

(3) Rehearse the presentation and control the time and order of the whole presentation

4. Meeting notes, decision, issues

Everyone has her task.

Give the prefect logo of the company;

Zhang Huizhuan are the first spokeswoman,who is prepared for the first part of introduction, Niu Pu will introduce the company;

Qiu Min and other three members give a small talk;

Li Yajun shows the product and Chen Na shows the sales chart.

Group:dream sky

英文會(huì)議紀(jì)要范文 [篇2]

Meeting minutes

Date: 17th September 2015

Address: 2203 Room

Conductor: Headmaster Mr. Wen

Present: 42 students

Absent: Li, Jiang

Open issues:

1. The arrangement of the vacation during Mid-Autumn Day and National Day. (Mid-Autumn Day 19th-22nd September; National Day 1st-8th October )

2. Pay attention to the safety within the vocation

3. No leaving in advance or late for back

New business:

1. The rehearsal of gymnastic for the sports games on 28th September

2. The open ceremony on 29th September

The end

Minutes submitted by: 任婭楠 11級(jí)旅游英語(yǔ)2班 20111103565

英文會(huì)議紀(jì)要范文 [篇3]

Project: Geotechnical Investigation at Ibity Holcim Cement Plant Meeting Date: 13/06/2012

Meeting Time: 15:00

Recorder: Tony

Location: Antananarivo, Madagascar

Present: Michele Franchi Geo-eco Consult

Toky Holcim Representative

Hua Kefu -------- Cement

------ -------- Cement

Pang Guoqiang --------- Cement

This meeting reaches agreement on the following issues:

I. Geotechnical investigation contractor and Holcim have discussed the old payment terms and formed a new payment term in the contract. Both sides agreed that the new payment terms which should be prescribed in geotechnical investigation contract to replace the old term.

II. Geotechnical investigation contractor pointed out that article 6.2 on contract agreement which is not acceptable according to Madagascar law. Contractor required that penalty value lower to 0.3% of the total contract price per day.Huaxin agreed this comment and modify this value to 0.3%.It will be prescribe in the geotechnical investigation contract.

III. As for contractor’s timing of work, Huaxin cement think that it’s too long and can not accept that total work timing. So contractor’s complete work timing is pending.

IV. Due to the EPC contact negotiation between Holcim and Huaxin is suspended, Huaxin can not sign the geotechnical investigation contract right now. However, both sides (--- & ------) agreed the geotechnical investigation contract contents. This

V. Contractor agreed to perform three continuous core drilling for knowing soil layer classification on site. A detailed boreholes layout with different types of tests mark out should be instantly returned to Huaxin after finish the first three continuous core drilling.

VI. For site topography surveying, Huaxin required that six control points are needed for that topography survey. Contractor agreed this suggestion.

VII. Contractor agreed to supply a site seismic report.

VIII. Huaxin required that contactor should reduce the amount of PLT (plate load test) to an appropriate number based on actual site situation. Previously PLT amount is 30 which are too much. Contractor agreed this comment.

IX.Annex: Contract

【英文會(huì)議紀(jì)要】相關(guān)文章:

英文會(huì)議紀(jì)要格式11-24

會(huì)議紀(jì)要英文格式11-24

會(huì)議紀(jì)要英文版格式11-24

會(huì)議紀(jì)要模版08-03

精選會(huì)議紀(jì)要格式11-23

會(huì)議紀(jì)要的寫(xiě)法11-23

會(huì)議紀(jì)要樣本11-24

精選會(huì)議紀(jì)要范本11-24

班子會(huì)議紀(jì)要06-17

講話會(huì)議紀(jì)要11-24

主站蜘蛛池模板: 黄大仙区| 吴旗县| 厦门市| 巴林左旗| 长宁县| 周宁县| 临潭县| 寿宁县| 大余县| 遂川县| 进贤县| 交城县| 中宁县| 容城县| 石城县| 尼勒克县| 汝阳县| 应城市| 桂东县| 田阳县| 丽江市| 沙田区| 巨鹿县| 北京市| 新巴尔虎左旗| 阿鲁科尔沁旗| 泗阳县| 尚志市| 牙克石市| 海兴县| 石泉县| 奇台县| 南汇区| 余干县| 德格县| 南川市| 新晃| 黑水县| 兴安县| 新建县| 大名县|