奶头挺立呻吟高潮av全片,成人试看120秒体验区,性欧美极品v,A片高潮抽搐揉捏奶头视频

試題

職稱英語《綜合C》補全短文專項習題

時間:2025-02-28 20:03:07 試題 我要投稿
  • 相關推薦

2017職稱英語《綜合C》補全短文專項習題

  設立專項習題的好處就是考生可以根據自己的薄弱項目,自行增加或減少練習。下面是小編整理的2017職稱英語《綜合C》補全短文專項習題,希望對大家有用,更多信息請瀏覽應屆畢業生考試網!

2017職稱英語《綜合C》補全短文專項習題

  The World's Longest Bridge

  Rumor has it that a legendary (傳說的) six-headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily. __________ (46) When completed in 2010,the world's longest bridge will weigh nearly 300,000 tons---equivalent to the iceberg that sank the Titanic--and stretch 5 kilometers long. "That's nearly 50 percent longer than any other bridge ever built," says structural engineer Shane Rixon.

  __________(47) They're suspension bridges, massive structures built to span vast water channels or gorges (峽谷). A suspension bridge needs just two towers to shoulder the structure's mammoth ( 巨大的 ) weight, thanks to hefty ( 高強度的 ) supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54,100-ton towers, which will support most of the bridge's load. The beefy(結實的) cables of the bridge, each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built.

  When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers.__________ (48) Getting these cables up will be something. It's not just theft length--totally 5.3 kilometers--but their weight.__________(49)

  After lowering vertical "suspender" cables from the main cables, builders will erect a 60 meter-wide 54,630-ton steel roadway, or deck--wide enough to accommodate 12 lanes of traffic.

  The deck's weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank (拽) up against their firmly rooted anchors with a force of 139,000 tons---equivalent to the weight of about 100,000 cars. Those anchors are essential. __________ (50)

  A. Some environmentalists are against the project on biological grounds.

  B. What do the world's longest bridges have in common?

  C. If true, one day you might spy the beast while zipping (呼嘯而過) across the Messina Strait Bridge.

  D. They're what will keep the bridge from going anywhere.

  E. The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires.

  F. They will tip up the scales at 166,500 tons--more than half the bridge's total mass.

  參考答案

  46.C。選項C中有一個關鍵詞beast,與第一句中的monster相呼應。所以C是答案。

  47.B。第二段第二句的主語是they。由于表語是suspension bridges,所以they替代的一定是前面句子出現過的bridges。六個選項中,只有B含有bridges。因此填在第二段段首,使意思連貫。

  48.E?瞻滋幥懊娴木渥又杏衪he first iob這幾個詞。有first,必有second/then。六個選項中,只有E含有the second iob,所以E是答案。

  49.F?瞻滋幥懊娴木渥诱f的是,把這些吊索吊高定位是有難度的,因為它們不僅很長,還很重;后面應該接著說吊索的情況,故選F。

  50.D?瞻滋幥懊娴木渥诱f橋樁很重要,后面接著還應該說橋樁的事情。D項解釋了橋樁的作用,故選D。

【職稱英語《綜合C》補全短文專項習題】相關文章:

2017職稱英語《綜合C》補全短文專項練習09-25

2018年職稱英語補全短文綜合C專項訓練07-26

2017職稱英語《綜合C》補全短文練習題07-13

2017職稱英語綜合C短文補全練習題11-08

2017職稱英語考試《綜合C》補全短文專項練習06-10

職稱英語試題《綜合C》補全短文的練習題10-24

職稱英語試題《綜合C》補全短文練習題10-24

職稱英語《綜合A》補全短文專項練習及答案08-08

職稱英語綜合A類補全短文專項訓練11-08

主站蜘蛛池模板: 凤城市| 东阳市| 民和| 北安市| 靖边县| 和平县| 若羌县| 达拉特旗| 沙雅县| 广州市| 山东| 永吉县| 六枝特区| 清远市| 阜南县| 裕民县| 黄浦区| 合川市| 成都市| 尉氏县| 宁津县| 建昌县| 城市| 巴青县| 柘城县| 福建省| 肃宁县| 洛隆县| 聊城市| 页游| 临澧县| 阜阳市| 昆明市| 如皋市| 甘肃省| 宜都市| 长泰县| 麻阳| 沙洋县| 扎鲁特旗| 六安市|