奶头挺立呻吟高潮av全片,成人试看120秒体验区,性欧美极品v,A片高潮抽搐揉捏奶头视频

試題

職稱英語考試《綜合A》補全短文專項練習題

時間:2024-12-27 22:31:32 試題 我要投稿

2017年職稱英語考試《綜合A》補全短文專項練習題

  2017年職稱英語考試復習已經開始,為了幫助大家更好地備考職稱英語考試,yjbys網小編為大家提供了相應的練習題,以下是2017年職稱英語考試《綜合A》補全短文專項練習題,供大家練習。

2017年職稱英語考試《綜合A》補全短文專項練習題

  The World'.s Longest Bridge

  Rumor has it that a legendary (傳說的) six-headed monster lurks in the deep waters of the Tyrrhenian Sea between Italy and the island of Sicily._________ (46) When completed in 2010,the world's longest bridge will weigh nearly 300,000 tons--equivalent to the iceberg that sank the Titanic-- and stretch 5 kilometers long. "That's nearly 50 percent longer than any other bridge ever built," says structural engineer Shane Rixon.

  _________ (47) They're suspension bridges, massive structures built to span vast water channels or gorges (峽谷). A suspension bridge needs just two towers to shoulder the structure's mammoth ( 巨大的 )weight, thanks to hefty (高強度的)supporting cables slung between the towers and anchored firmly in deep pools of cement at each end of the bridge. The Messina Strait Bridge will have two 54, 100-ton towers, which will support most of the bridge' s load. The beefy (結實的 )cables of the bridge, each 1.2 meter in diameter, will hold up the longest and widest bridge deck ever built.

  When construction begins on the Messina Strait Bridge in 2005, the first job will be to erect two 370 meter-tall steel towers. _________ (48) Getting these cables up will be something. It's not just their length -- totally 5.3 kilometers -- but their weight. _________ (49)

  After lowering vertical "suspender" cables from the main cables, builders will erect a 60 meter-wide 54,630-ton steel roadway, or deck--wide enough to accommodate 12 lanes of traffic.

  The deck's weight will pull down on the cables with a force of 70,500 tons. In return, the cables yank (拽) up against their firmly rooted anchors with a force of 139,000 tons--equivalent to the weight of about 100,000 cars. Those anchors are essential. _________ (50)

  A. Some environmentalists are against the project on biological grounds.

  B. What do the world's longest bridges have in common?

  C. If true, one day you might spy the beast while zipping (呼嘯而過) across the Messina Strait Bridge.

  D. They're what will keep the bridge from going anywhere.

  E. The second job will be to pull two sets of steel cables across the strait, each set being a bundle of 44,352 individual steel wires.

  F. They will tip up the scales at 166,500 tons--more than half the bridge's total mass.

  試題答案及解析

  46.C。選項C中有一個關鍵詞beast,與第一句中的monster相呼應。所以C是答案。

  47.B。第二段第二句的主語是they。由于表語是suspension bridges,they替代的一定是前面句子出現過的bridges。六個選項中,只有B含有bridges。填在第二段段首,意思連貫。

  48.E。空白處前面的句子中有the first job這幾個詞。有first,必有second/then。六個選項中,只有E含有the second job,所以E是答案。

  49.F。空白處前面的句子說的是,把這些吊索吊高定位是有難度的,不僅僅由于它們很長,還由于它們很重。后面應該接著說吊索的情況,選項F具體地介紹了它們的重量。

  50.D。空白處前面的句子說的是,橋樁很重要。后面接著還應該說橋樁的事情,選項D解釋了橋樁的作用,故選D。

【職稱英語考試《綜合A》補全短文專項練習題】相關文章:

2017年職稱英語考試綜合A補全短文專項練習題06-30

2017職稱英語考試《綜合C》補全短文專項練習06-10

職稱英語考試綜合A補全短文訓練08-08

2017年職稱英語考試《綜合B》補全短文專項練習09-18

職稱英語《綜合A》補全短文專項練習及答案08-08

職稱英語綜合A類補全短文專項訓練11-08

職稱英語考試補全短文專題訓練「綜合A」08-04

2017年職稱英語考試《綜合B》補全短文練習題09-19

2017職稱英語考試綜合類補全短文練習題10-22

主站蜘蛛池模板: 灵石县| 渝北区| 三穗县| 建昌县| 浦东新区| 丹寨县| 吉隆县| 平果县| 台州市| 瓮安县| 额济纳旗| 嵩明县| 宜君县| 远安县| 疏勒县| 甘肃省| 连山| 曲周县| 本溪市| 和龙市| 宜章县| 浦北县| 灵山县| 诸暨市| 东阿县| 万载县| 屏山县| 临湘市| 延津县| 松溪县| 辽源市| 读书| 南投县| 延庆县| 安西县| 冕宁县| 绥江县| 武陟县| 民和| 乐都县| 肇源县|