奶头挺立呻吟高潮av全片,成人试看120秒体验区,性欧美极品v,A片高潮抽搐揉捏奶头视频

試題

雅思寫作小作文流程圖滿分

時(shí)間:2024-10-27 19:13:49 試題 我要投稿
  • 相關(guān)推薦

雅思寫作小作文流程圖滿分范文

  流程圖寫作是雅思常會(huì)遇到的小作文類型之一,考生可在平時(shí)對(duì)這一類的小作文進(jìn)行一些必要的練習(xí)。下面是小編送給大家的兩篇雅思寫作小作文流程圖滿分范文,希望對(duì)大家有所幫助。

雅思寫作小作文流程圖滿分范文

  雅思寫作小作文流程圖滿分范文一

  話題:

  The diagrams below show how houses can be protected in areas which are prone to flooding.

  范文

  The diagrams compare two different methods of defence for homes which are at risk of being flooded.

  The key difference between the diagrams is that they show flood protection with and without a stopbank. In either case, the at-risk home is raised on stilts above ground level.

  The first diagram shows how a stopbank acts as a flood barrier to stop river water from flooding homes. The stopbank is a small mound of land next to the river that is higher than the 100-year flood level, and prevents the river from bursting its banks. Nearby houses can be built on stilts to prevent flooding from rainwater, and a floodgate beneath the stopbank can be opened to allow this ‘ponding’ to drain off into the river.

  When there is no stopbank, as shown in the second diagram, there will be nothing to stop the river from flooding. In this case, the solution is to put buildings on stilts. The height of the stilts is measured so that the floor of the house is 300mm above the 100-year flood level. This measurement is called the ‘freeboard’.

  雅思寫作小作文流程圖滿分范文二

  話題:

  The diagram below shows how solar panels can be used to provide electricity for domestic use.

  范文

  The picture illustrates the process of producing electricity in a home using solar panels.

  It is clear that there are five distinct stages in this process, beginning with the capture of energy from sunlight. The final two steps show how domestic electricity is connected to the external power supply.

  At the first stage in the process, solar panels on the roof of a normal house take energy from the sun and convert it into DC current. Next, this current is passed to an inverter, which changes it to AC current and regulates the supply of electricity. At stage three, electricity is supplied to the home from an electrical panel.

  At the fourth step shown on the diagram, a utility meter in the home is responsible for sending any extra electric power outside the house into the grid. Finally, if the solar panels do not provide enough energy for the household, electricity will flow from the utility grid into the home through the meter.

【雅思寫作小作文流程圖滿分】相關(guān)文章:

2016雅思寫作小作文流程圖答題解析08-29

2017雅思流程圖寫作技巧07-20

2016雅思流程圖寫作答題技巧08-14

雅思寫作滿分范文:環(huán)保06-04

雅思寫作餅圖小作文滿分范文(通用20篇)10-02

雅思考試寫作指導(dǎo):流程圖難解?06-04

雅思寫作滿分范文:大學(xué)教育10-10

雅思寫作輔導(dǎo):滿分標(biāo)準(zhǔn)詳解09-13

雅思大作文寫作小技巧06-16

雅思A類小作文寫作常見誤區(qū)09-10

主站蜘蛛池模板: 榆中县| 海盐县| 博客| 大荔县| 泸定县| 扶风县| 巴林右旗| 冷水江市| 安岳县| 隆林| 泗洪县| 临江市| 高平市| 吴江市| 武乡县| 巴青县| 神木县| 普兰店市| 虞城县| 南宁市| 钦州市| 邻水| 宜宾县| 禹城市| 利川市| 东宁县| 望都县| 如东县| 甘谷县| 绥宁县| 运城市| 乐都县| 南充市| 高青县| 阿拉善左旗| 吉隆县| 大田县| 夏河县| 平阳县| 临沧市| 南城县|