試題

英語四級考試閱讀單項選擇練習題

時間:2024-09-17 15:43:16 試題 我要投稿
  • 相關推薦

英語四級考試閱讀單項選擇練習題

  All shall be well, Jack shall have Jill.以下是小編為大家搜索整理的英語四級考試閱讀單項選擇練習題,希望能給大家帶來幫助!更多精彩內容請及時關注我們應屆畢業生考試網!

英語四級考試閱讀單項選擇練習題

  In the last two hundred years there have been great changes in the method of production of goods. This is now also true of the building industry; for mechanization has been introduced. System building can save both time and money. The principle of system building is that the building is made from a set of standard units. These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular (標準件的) system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  ◆1. Which of these statements is TRUE of system building?

  A. It employs more men.

  B. It is difficult and dangerous.

  C. It can save both time and money.

  D. It means less mechanization.

  ◆2. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  ◆3. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  ◆4. What lifts the concrete panels onto the building?

  A. Cranes.

  B. Man-power.

  C. Pulleys.

  D. Hydraulic jacks.

  ◆5. The usual fixed length in the modular system is_______.

  A. twenty centimeters

  B. ten millimeters

  C. fifty centimeters

  D. ten centimeters

  【參考答案】

  1. C 2.A 3. B 4. A 5. D

【英語四級考試閱讀單項選擇練習題】相關文章:

英語四級考試閱讀單項選擇試題09-26

2017公共英語四級單項選擇練習題07-28

公共英語四級考試單項選擇題解析07-01

2017年6月大學英語四級單項選擇考試練習題09-12

2025大學英語四級考試單項選擇題09-24

2016證券從業資格考試單項選擇練習題09-10

英語四級考試閱讀練習題及答案201709-07

英語四級考試閱讀練習題附答案06-11

英語四級考試閱讀經典段落練習題07-18

公共英語pets-2單項選擇練習題07-06

主站蜘蛛池模板: 延长县| 铜川市| 攀枝花市| 安平县| 舞阳县| 江孜县| 朝阳区| 红河县| 钟祥市| 清涧县| 美姑县| 连城县| 雷波县| 清水县| 钟山县| 家居| 汨罗市| 塘沽区| 东乡县| 临泽县| 阜宁县| 荆门市| 云南省| 昌图县| 宜丰县| 枣阳市| 安顺市| 工布江达县| 永州市| 师宗县| 清丰县| 望城县| 阿克苏市| 昌都县| 安阳县| 东明县| 汨罗市| 泰来县| 东乌珠穆沁旗| 乐东| 西城区|