奶头挺立呻吟高潮av全片,成人试看120秒体验区,性欧美极品v,A片高潮抽搐揉捏奶头视频

會議紀要

會議記錄 英文

時間:2021-11-25 18:12:36 會議紀要 我要投稿

會議記錄模板 英文

Project: Geotechnical Investigation at Ibity Holcim Cement Plant Meeting Date: 13/06/2012

會議記錄模板 英文

Meeting Time: 15:00

Recorder: Tony

Location: Antananarivo, Madagascar

Present: Michele Franchi Geo-eco Consult

Toky Holcim Representative

Hua Kefu -------- Cement

------ -------- Cement

Pang Guoqiang --------- Cement

This meeting reaches agreement on the following issues:

I. Geotechnical investigation contractor and Holcim have discussed the old payment terms and formed a new payment term in the contract. Both sides agreed that the new payment terms which should be prescribed in geotechnical investigation contract to replace the old term.

II. Geotechnical investigation contractor pointed out that article 6.2 on contract agreement which is not acceptable according to Madagascar law. Contractor required that penalty value lower to 0.3% of the total contract price per day.Huaxin agreed this comment and modify this value to 0.3%.It will be prescribe in the geotechnical investigation contract.

III. As for contractor’s timing of work, Huaxin cement think that it’s too long and can not accept that total work timing. So contractor’s complete work timing is pending.

IV. Due to the EPC contact negotiation between Holcim and Huaxin is suspended, Huaxin can not sign the geotechnical investigation contract right now. However, both sides (--- & ------) agreed the geotechnical investigation contract contents. This

頁眉:自己填寫

V. Contractor agreed to perform three continuous core drilling for knowing soil layer classification on site. A detailed boreholes layout with different types of tests mark out should be instantly returned to Huaxin after finish the first three continuous core drilling.

VI. For site topography surveying, Huaxin required that six control points are needed for that topography survey. Contractor agreed this suggestion.

VII. Contractor agreed to supply a site seismic report.

VIII. Huaxin required that contactor should reduce the amount of PLT (plate load test) to an appropriate number based on actual site situation. Previously PLT amount is 30 which are too much. Contractor agreed this comment.

IX.Annex: Contract

會議記錄模板 英文 [篇2]

meeting record

project name: make the report

date of meeting: may 13, 2012

minutes prepared by: zhang huizhuan

charge time to: 20 minutes

1. purpose of the meeting

finish the topic of business results and give the report

2. attendance at meeting

zhang huizhuan li gaojie qiu min li yajun zhen peipei chen na liu dan niu pu

3. meeting agenda

(1) definite the responsibility of every member

(2) talk about how to write the report

(3) make the report to the whole one

4. meeting notes, decision, issues

niu pu is in charge for the introduction;

chen na and li yajun is in charge for ananlysis the chart for sales and market;

the others of the group are responsible for the talk about how to describe the business results

zhang huizhuan makes the conclusion; give the chart for the topic and the whole order of the report.

group: dream sky

會議記錄模板 英文 [篇3]

Meeting record

Project name: make the report

Date of meeting: May 13, 2012

Minutes prepared by: Zhang Huizhuan

Charge time to: 20 minutes

1. Purpose of the meeting

Finish the topic of business results and give the report

2. Attendance at meeting

Zhang Huizhuan Li Gaojie Qiu Min Li Yajun Zhen Peipei Chen Na Liu Dan Niu Pu

3. Meeting agenda

(1) Definite the responsibility of every member

(2) Talk about how to write the report

(3) Make the report to the whole one

4. Meeting notes, decision, issues

Niu Pu is in charge for the introduction;

Chen Na and Li Yajun is in charge for ananlysis the chart for sales and market;

The others of the group are responsible for the talk about how to describe the business results Zhang Huizhuan makes the conclusion; give the chart for the topic and the whole order of the report.

Group: dream sky

Meeting record

Project name: talk about the PowerPoint

Date of meeting: May 18, 2012

Minutes prepared by: Zhang Huizhuan

Charge time to: 20 minutes

1. Purpose of the meeting

Make the PowerPoint for the topic of business results, and definite the role of the whole presentation

2. Attendance at meeting

Zhang Huizhuan Li Gaojie Qiu Min Li Yajun Zhen Peipei Chen Na Liu Dan Niu Pu

3. Meeting agenda

(1) Talk about the member’s order of giving the presentation

(2) Definite the part of every member

(3) Rehearse the presentation and control the time and order of the whole presentation

4. Meeting notes, decision, issues

Everyone has her task.

Give the prefect logo of the company;

Zhang Huizhuan are the first spokeswoman,who is prepared for the first part of introduction, Niu Pu will introduce the company;

Qiu Min and other three members give a small talk;

Li Yajun shows the product and Chen Na shows the sales chart.

Group:dream sky

【會議記錄 英文】相關文章:

英文會議記錄模板09-04

會議記錄與紀要的區別06-11

社團會議記錄模板09-04

銷售會議記錄模板09-04

防汛會議記錄模板09-04

人事會議記錄模板09-04

英語會議記錄模板09-04

部門會議記錄模板09-04

WORD會議記錄模板09-04

主站蜘蛛池模板: 修水县| 突泉县| 昌吉市| 商洛市| 大名县| 田阳县| 松潘县| 五常市| 苗栗市| 霞浦县| 西安市| 离岛区| 利辛县| 武强县| 普兰县| 合山市| 广安市| 铁岭县| 彭州市| 城口县| 津南区| 竹溪县| 巴彦淖尔市| 林甸县| 通州市| 朝阳县| 铁力市| 玛多县| 万山特区| 芒康县| 大理市| 夹江县| 乐山市| 延寿县| 大姚县| 岳阳市| 灵璧县| 宜兴市| 武川县| 泸水县| 偏关县|